How much drywall mud do I need?
Drywall mud, also called joint compound, goes on in three coats, so the amount is counted per coat. The first coat beds the tape. The second coat fills the joint. The third coat feathers the edge out smooth. Each coat uses mud, and the first coat uses the most. If you buy mud for one coat only, you will run out on the second day of the job.
This free drywall mud calculator counts all three coats at once. Enter the total joint length in metres and the number of coats, and it shows the mud in kilograms, the number of buckets, and the split across the three coats. It works in the browser, with no sign-up and no download. The planning figure is 0.4 kilograms of mud per metre of joint per coat.
How to use the calculator
Measure the joints first. Add up every flat joint on the walls and the ceiling, every inside corner, and every outside corner, in metres. If you already counted the joints for tape, use the same total: the tape calculator and the mud calculator use the same joint length. Enter that total in the first box.
Leave the coats at 3 unless your job is different. A patch repair may need only 2 coats, and a rough wall may need a fourth skim coat. Enter your bucket size too. Standard buckets are 20 kilograms, and the tool uses 20 as the default. Press the button. The tool shows the total kilograms, the buckets to buy, and the three bars for coat 1, coat 2, and coat 3.
Worked example
Here is a real room, worked through step by step. The total joint length is 120 metres. The job needs 3 coats. The rate is 0.4 kilograms per metre per coat. The total mud is 120 times 3 times 0.4, which is 144 kilograms.
With 20-kilogram buckets, 144 divided by 20 is 7.2, so you need 8 buckets. The three-coat split is 40 percent for coat 1, 35 percent for coat 2, and 25 percent for coat 3. Coat 1 uses 57.6 kilograms, coat 2 uses 50.4 kilograms, and coat 3 uses 36 kilograms. The first coat is the heaviest because it beds the tape and fills the deepest gaps.
Try the numbers in the tool above and you will see the same result. Change the coats to 2 and the total falls to 96 kilograms, which is 5 buckets. Change the joint length to 60 metres and 3 coats need only 72 kilograms, which is 4 buckets.
When this calculator helps
Home renovators use it before a drywall job, so they buy all the mud in one trip. Mud is heavy: 144 kilograms is 8 buckets, and nobody wants to carry those twice. Buying the right amount first also keeps the mud from one batch, so the colour and the drying time stay the same across the room.
It also helps when you plan the drying time. Each coat must dry before the next goes on, and a thick first coat dries slowly. Knowing that coat 1 uses 57.6 kilograms tells you it is a full day of work, not a quick hour.
Honest limitations
The rate of 0.4 kilograms per metre per coat is a planning figure for normal joints. Wide joints, deep gaps, and screw holes use more mud. A first-time taper uses more too, because more mud ends up on the floor and on the knife than on the wall. If this is your first job, buy one extra bucket and keep the receipt.
The tool counts mud for joints only. It does not count mud for screw heads, corner bead, or a full skim coat over a whole wall. A skim coat can use more mud than all the joints together. Measure skim areas separately and add them to the total by hand.
Frequently asked questions
How many kilograms of drywall mud per metre of joint? About 0.4 kilograms per metre per coat, or about 1.2 kilograms per metre for a full three-coat job. A room with 120 metres of joints needs about 144 kilograms of mud in total.
How many coats of drywall mud do I need? Three coats is the standard: a tape coat, a fill coat, and a finish coat. Two coats can work on a small patch, and a rough wall may need a fourth coat. Each extra coat adds about a third more mud.
How big is a bucket of drywall mud? Standard buckets are 20 kilograms, and some brands sell 25-kilogram buckets. Check the pack and enter the real size in the tool, because the bucket count changes with it.
Can I reuse leftover drywall mud? Yes, if the bucket was sealed and the mud stayed clean. Dried lumps and dust ruin a finish coat, so scoop from the top and throw away any skin that formed on the surface. Store the bucket upside down to keep the seal tight.